Commercial Roof Installation Bulleen VIC

659Properties affected in a modelled 1 in 100 year flood in the Bulleen North catchment, per Manningham’s 2015 study
86Floors flooded in that same modelled event
C109Manningham amendment that revised the Special Building Overlay and Land Subject to Inundation Overlay
23 Dec 2019Date the Minister approved the planning amendment for North East Link, which includes works in Bulleen

Commercial roofing services in Bulleen

Your building Page
Factory Factory roof installation
Warehouse Warehouse roof installation
Office building Office building roof installation
Shopping centre Shopping centre roof installation
Metal roof replacement Commercial metal roofing
Roof replacement, repair and maintenance Work through the permit, plumbing and asbestos checks on our home page first.

Flood checks for Bulleen roofs

Manningham Council commissioned a flood study of the Bulleen North catchment as part of a 2015 technical report on its Special Building Overlay. For a modelled 1 in 100 year flood, combining council and Melbourne Water drainage systems, it found 659 properties affected and 86 floors flooded. The report notes that flooding from the Yarra River and Koonung Creek would normally be covered by the flood zone, Floodway Overlay or Land Subject to Inundation Overlay (LSIO) provisions, while the Special Building Overlay (SBO) covers drainage flooding.

Special Building Overlay (SBO1)

Manningham’s existing overlay for drainage flooding. Amendment C109 revised it, and the Minister for Planning approved part 1 of that amendment, which amends SBO1 and the LSIO and removes them from some properties.

Land Subject to Inundation Overlay

The overlay for flooding from watercourses such as the Yarra River and Koonung Creek. Check VicPlan for whether it applies to the address.

The figures above are modelled and date from 2015. They show the scale of drainage flooding in Bulleen North, not whether a particular building floods. The overlays have been amended since, so check the current overlay map for the address, and ask Manningham and Melbourne Water what applies.

Commercial roofer installing metal panels

North East Link works in Bulleen

The Victorian Government’s North East Link planning amendment was approved on 23 December 2019. The project’s own material says early works made major changes to intersections along Bulleen Road, Manningham Road and Templestowe Road to allow for the Manningham Interchange, and that from 2024 work would focus on tunnelling and on a major new interchange at Bulleen Road, connecting the upgraded Eastern Freeway to the 6.5 km tunnels. The amendment includes an incorporated document through a Specific Controls Overlay for the project, and its sites include Manningham Road in Bulleen and the Eastern Freeway in Bulleen.

The project’s status will have moved since those documents were published, so check what is current before relying on any of it. For a roof job, the practical questions are whether the property sits inside project land, and how site access and deliveries are affected by the changed roads around it.

Before you book roof work in Bulleen

  1. Look the address up on VicPlan for the SBO, the LSIO, and any Specific Controls Overlay.
  2. If a flood overlay applies, ask Manningham whether the roof work needs a permit, and who designs and certifies the roof drainage and overflows.
  3. If the building is near Bulleen Road, Manningham Road or the Eastern Freeway, ask whether it is inside North East Link project land.
  4. Ask about site access and delivery routes, because roads and intersections around the interchange have changed.
  5. For a replacement, work through the permit, plumbing and asbestos checks on the home page.

Questions about roofs in Bulleen

What is the difference between the SBO and the LSIO in Bulleen?

Manningham’s 2015 technical report says flooding from the Yarra River and Koonung Creek would normally be covered by flood zone, Floodway Overlay or LSIO provisions, while the Special Building Overlay covers drainage flooding. Amendment C109 amended Manningham’s SBO1 and LSIO. Check VicPlan for the address, and ask Manningham which applies.

Does the North East Link planning amendment affect my building?

The amendment, approved on 23 December 2019, applies a Specific Controls Overlay for the project, with sites that include Manningham Road and the Eastern Freeway in Bulleen. It is aimed at project land, so ask Manningham or the North East Link project whether your property is inside it, and check what is current, because the project has moved on since.

What should I have ready before I call about a roof in Bulleen?

The building address, what the roof is made of, and what is going wrong. Add whether you know the site is in a flood overlay or near North East Link works, any ponding or leaking box gutters you have seen, and any asbestos register or test results you hold.

Talk to us about your Bulleen roof

Call 1300 941 905 or send the form with the building address, the roof type and what is going wrong.

Call Now