Commercial Roof Installation Bacchus Marsh VIC

18 Mar 2022Date Moorabool’s flood overlays (Amendment C91) came into operation, covering Bacchus Marsh, Maddingley and Darley
1 in 100Annual flood chance that Moorabool’s flood overlays map
Melbourne WaterDetermining referral authority for permit applications on Moorabool’s flood overlay land
Nov 1995Significant flood when the Werribee River broke its banks in Bacchus Marsh, per SES

Commercial roofing services in Bacchus Marsh

Roof installation

New roofing for commercial, industrial and agricultural buildings.

Roof replacement

Removing an ageing roof and fitting a new one. Work through the permit, plumbing and asbestos checks on our home page first.

Roof repair and maintenance

Fixing leaks and damage, plus regular roof checks and upkeep.

Flat, metal and industrial roofing

See commercial metal roofing, industrial roofing, warehouse roofs and cold storage roofs.

Flood controls in Bacchus Marsh, Maddingley and Darley

Moorabool’s planning scheme had no flood controls until Amendment C91 came into operation on 18 March 2022. Moorabool Council’s documents say large areas of the shire are prone to flooding from the Moorabool, Werribee, Lerderderg and Little Rivers and their tributaries, and that some urban areas are prone to overland flows from the urban drainage system.

Point What Moorabool’s documents say What to do
The overlays The Land Subject to Inundation Overlay (LSIO) and Special Building Overlay (SBO) apply to land affected by a 1 in 100 year flood in the eastern part of Moorabool, including Bacchus Marsh, Maddingley and Darley. They apply only to the parts of a property that are affected. Look the address up on VicPlan.
Permits Council’s explanatory report says that in LSIO or SBO areas a permit is required for subdivision and most new buildings and works, with some exemptions for minor buildings and works. Ask Moorabool whether your roof work counts as a minor exemption.
Referral All planning permit applications under the LSIO or SBO are referred to Melbourne Water as a determining referral authority. Allow time for the referral if a permit is needed.
Flood history SES records a significant flood in November 1995, when the Werribee River broke its banks and flooded low-lying parts of the town and surrounding farmland. Read SES’s Moorabool flood guide.

On a flood-overlay site, ask whether the roof job needs a permit before you book. A permit is required for most new buildings and works in the overlay, with exemptions for minor ones. Whether a roof replacement counts depends on the work, and only Moorabool can confirm it for your address.

Commercial roofing

Bushfire: check the mapped status

Moorabool’s planning scheme has an objective to minimise bushfire damage, and names the Bushfire Management Overlay for areas of fire risk. The Minister for Planning has designated Bushfire Prone Areas under the Building Act since November 2011. State guidance says that in both Bushfire Prone Areas and the Bushfire Management Overlay, construction needs to meet specific requirements under AS 3959, with a Bushfire Attack Level assessed when a building permit is required. Which building classes that covers is a question for your building surveyor. Look the address up on VicPlan first.

Before you book roof work in Bacchus Marsh

  • Look the address up on VicPlan for the LSIO, SBO and Bushfire Management Overlay, and check whether it is in a Bushfire Prone Area.
  • If a flood overlay applies, ask Moorabool whether the roof work needs a permit, and allow time for Melbourne Water’s referral.
  • Ask your building surveyor whether any bushfire construction requirements apply to the building.
  • Ask who designs and certifies the roof drainage and overflows. Box gutter rules are set out on our commercial metal roofing page, linked above.
  • For a replacement, work through the permit, plumbing and asbestos checks on the home page, especially if the existing roof is cement sheeting.

Questions about roofs in Bacchus Marsh

Is my Bacchus Marsh property in a flood overlay?

It depends on the address. Moorabool’s Amendment C91, in operation since 18 March 2022, applies the LSIO and SBO to land affected by a 1 in 100 year flood in the eastern part of the shire, including Bacchus Marsh, Maddingley and Darley. Check VicPlan for the property, and ask Moorabool if anything shows up.

Does a roof replacement on a flood-overlay property need a planning permit?

Moorabool’s explanatory report says a permit is required in LSIO and SBO areas for subdivision and most new buildings and works, with some exemptions for minor buildings and works. Whether a roof job counts depends on the work, so ask Moorabool. Permit applications on this land are referred to Melbourne Water.

How do I find out whether a building is in a bushfire prone area?

VicPlan shows whether a property is in a Bushfire Prone Area or the Bushfire Management Overlay. State guidance says that in both, construction needs to meet specific requirements under AS 3959, with a Bushfire Attack Level assessed when a building permit is required. Which building classes that covers is a question for your building surveyor.

What should I have ready before I call about a roof in Bacchus Marsh?

The building address, what the roof is made of, and what is going wrong. Add whether you know the site is in a flood or bushfire overlay, any ponding you have seen on the roof, and any asbestos register or test results you hold.

Talk to us about your Bacchus Marsh roof

Call 1300 941 905 or send the form with the building address, the roof type and what is going wrong.

Call Now