Commercial Roof Installation Keilor VIC

10 propertiesKeilor properties given interim flood overlay controls by Amendment GC236 after the October 2022 Maribyrnong River flood
3,547Brimbank homes inside the Melbourne Airport Environs Overlay, including in Keilor and Keilor Park, per council in March 2024
HO131Heritage Overlay number covering buildings on Old Calder Highway in Keilor Village
StateGrading the heritage study gives the Keilor Village Precinct

Commercial roofing services in Keilor

Roof installation

New roofing for commercial, industrial and education buildings.

Roof replacement

Removing an ageing roof and fitting a new one. Work through the permit, plumbing and asbestos checks on our home page first.

Roof repair

Fixing leaks, box gutters and flashings without replacing the whole roof.

Roof maintenance

Regular roof checks and upkeep, so small faults are found early.

Commercial flat roofing

Roofing for commercial buildings with flat roofs.

Metal and industrial roofing

See our commercial metal roofing and industrial roofing pages.

Keilor’s flood, airport and heritage checks

Three separate controls matter in Keilor, and which applies depends on the address.

Control What the sources say What to do
Flood, GC236 The Minister gazetted Amendment GC236, giving effect to interim Land Subject to Inundation Overlay controls on land affected by the October 2022 Maribyrnong River flood where no flood overlay existed. It covers 10 properties in Keilor. Brimbank Council has also said it supports Melbourne Water asking for interim controls in Flora Street. Look the address up on VicPlan, and check Melbourne Water’s Maribyrnong information.
Airport overlay Brimbank says about 3,547 homes in the municipality are inside the Melbourne Airport Environs Overlay, including in Keilor and Keilor Park. Brimbank planning applications on Keilor Park Drive and in Keilor refer to Schedule 2 of the overlay. The overlay is explained once on our Airport West page. Ask Brimbank whether the planned work needs a permit under the overlay.
Keilor Village heritage The Victorian Heritage Database describes the Keilor Village Precinct around Old Calder Highway and Macedon Street, with significant buildings including the Court House, Police Station and Keilor Hotel. Individual buildings on Old Calder Highway sit in Heritage Overlay HO131. Brimbank’s Keilor Village Vision guides potential future development. Check VicPlan for the Heritage Overlay before ordering materials.

Don’t assume a flood overlay is absent because the old map showed none. GC236 was applied to properties that had no overlay before October 2022, and Melbourne Water says permanent controls will follow its updated modelling. Check VicPlan for the address, and ask Brimbank what applies today.

Commercial roofing

River flood background

The wider Maribyrnong River flood story, including the review of the 2022 event and the planning controls being rebuilt, is set out on our Avondale Heights page and Flemington page. For Keilor, the point is that overlays here are still changing.

Before you book roof work in Keilor

  1. Look the address up on VicPlan for flood overlays, including any interim controls, and for the Heritage Overlay.
  2. If the address is on or near Keilor Park Drive, ask Brimbank whether the airport overlay needs a permit for the work.
  3. If the building is in Keilor Village, ask Brimbank whether the roof work needs a heritage permit.
  4. Ask who designs and certifies the box gutters and overflows. Victoria’s rules are set out on our commercial metal roofing page, linked above.
  5. For a replacement, work through the permit, plumbing and asbestos checks on the home page.

Questions about roofs in Keilor

Did the 2022 flood change planning controls in Keilor?

Yes. Amendment GC236 gave effect to interim Land Subject to Inundation Overlay controls on land affected by the October 2022 Maribyrnong River flood that had no overlay before. It covers 10 properties in Keilor. Melbourne Water says permanent controls will follow its updated modelling, so check VicPlan for the address.

Is Keilor under the Melbourne Airport Environs Overlay?

Parts are. Brimbank says about 3,547 homes in the municipality are inside the overlay, including in Keilor and Keilor Park, and Brimbank applications in Keilor and on Keilor Park Drive refer to Schedule 2. Look the address up on VicPlan, and ask Brimbank whether roof work needs a permit.

Are Keilor Village buildings heritage protected?

Many are. The Victorian Heritage Database describes the Keilor Village Precinct around Old Calder Highway and Macedon Street, and individual buildings on Old Calder Highway sit in Heritage Overlay HO131. Check VicPlan for the address, and ask Brimbank whether a roof job needs a permit.

What should I have ready before I call about a roof in Keilor?

The building address, what the roof is made of, and what is going wrong. Add whether you know the site is in a flood, airport or heritage overlay, any ponding or leaking box gutters you have seen, and any asbestos register or test results you hold.

Talk to us about your Keilor roof

Call 1300 941 905 or send the form with the building address, the roof type and what is going wrong.

Call Now