Commercial Roof Installation Reservoir Vic

Dec 2019When the High Street level crossing was removed and the new elevated Reservoir Station opened
36,000Vehicles a day that used the High Street crossing before it was removed, according to the Level Crossing Removal Project
Civic plazaA new plaza under the station connects Edwardes Street and Broadway
2014Darebin’s Reservoir Streetscape Master Plan covered the activity centre from Edwardes Street to Broadway

Commercial roofing services in Reservoir

Roof installation

New roofing for commercial, industrial and institutional buildings.

Roof replacement

Removing an ageing roof and fitting a new one. Work through the permit, plumbing and asbestos checks on our home page first.

Roof repair

Fixing leaks, box gutters and flashings without replacing the whole roof.

Roof maintenance

Regular roof checks and upkeep, so small faults are found early.

Commercial flat roofing

Roofing for commercial buildings with flat roofs.

Metal and industrial roofing

See our commercial metal roofing and industrial roofing pages.

Reservoir’s station precinct and activity centre

I found fewer Reservoir-specific planning controls than for some other suburbs, so this section sets out what the sources do establish.

Point What the sources say What to do
Station and plaza The Level Crossing Removal Project says the High Street, Reservoir level crossing was removed by building a rail bridge over the road. A new Reservoir Station and a public plaza were built, creating a direct connection between Edwardes Street and Broadway. The crossing was removed and the new station opened in December 2019. If the building is on Edwardes Street or Broadway, ask Darebin about any approvals that apply to the precinct.
Activity centre Darebin’s Reservoir Streetscape Master Plan (September 2014) refers to the Reservoir Activities Area Structure Plan, and its study area runs from Compton Street and Edwardes Street in the west to Whitelaw Street and Broadway in the east. Look the address up on VicPlan for the zone and overlays.
Flood and heritage I did not find a published Reservoir-specific flood map or heritage listing for the shopping strips. Darebin’s updated flood maps are explained on our Bundoora page, and its High Street heritage controls on our Northcote page. Check VicPlan for flood and Heritage Overlays on the address.

I could not confirm any of the old page’s claims about rail vibration or creek-driven leaf loads in Reservoir. The line was rebuilt on an elevated structure in 2019, and Darebin’s Reservoir planning documents don’t mention roof effects. Treat flood and heritage as address-by-address checks, and ask Darebin before assuming either way.

Commercial roofer installing metal panels

Before you book roof work in Reservoir

  1. Look the address up on VicPlan for the zone, any Heritage Overlay and flood overlays.
  2. Ask Darebin whether the roof work needs a permit, particularly for buildings on Edwardes Street, Broadway or High Street.
  3. If the building is close to the station, ask the Level Crossing Removal Project or the station operator about access.
  4. Ask who designs and certifies the box gutters and overflows. Victoria’s rules are set out on our commercial metal roofing page, linked above.
  5. For a replacement, work through the permit, plumbing and asbestos checks on the home page.

Neighbouring suburbs

See our pages for Preston, Bundoora and Northcote, all in Darebin.

Questions about roofs in Reservoir

What changed at Reservoir Station?

The Level Crossing Removal Project removed the High Street level crossing by building a rail bridge over the road, and opened a new Reservoir Station and a public plaza in December 2019. The plaza connects Edwardes Street and Broadway. Ask Darebin if a roof job near the plaza needs any approvals.

What is the Reservoir activity centre?

It is the shopping and civic area around Edwardes Street, Broadway and High Street. Darebin’s 2014 streetscape master plan covered it and refers to the Reservoir Activities Area Structure Plan. Look the address up on VicPlan for the zone, and ask Darebin which controls apply.

Is Reservoir affected by creek flooding?

I did not find a published Reservoir-specific flood map or study. Flood risk depends on the address, so look it up on VicPlan and ask Darebin and Melbourne Water what applies. Our Bundoora page explains Darebin’s updated flood maps.

What should I have ready before I call about a roof in Reservoir?

The building address, what the roof is made of, and what is going wrong. Add whether you know the site is in a flood or heritage overlay, any ponding or leaking box gutters you have seen, and any asbestos register or test results you hold.

Talk to us about your Reservoir roof

Call 1300 941 905 or send the form with the building address, the roof type and what is going wrong.

Call Now